Loading…

Liquid H2/O2

An Oxygen Not Included blueprint by EricSant767. Open it in the browser editor on this page.

cooling

25×22 tiles · 615 buildings

Buildings

  • 146× Insulated Tile
  • 77× Insulated Liquid Pipe
  • 71× Automation Wire
  • 71× Window Tile
  • 48× Heavi-Watt Conductive Wire
  • 44× Insulated Conductive Wire
  • 38× Tempshift Plate
  • 34× Gas Pipe
  • 29× Radiant Liquid Pipe
  • 12× Liquid Bridge
  • 8× Insulated Gas Pipe
  • 8× Mechanized Airlock
  • 4× High Pressure Gas Vent
  • 4× Steam Turbine
  • 3× Heavi-Watt Conductive Joint Plate
  • 3× Large Power Transformer
  • 3× Liquid Vent
  • 3× Thermo Aquatuner
  • 2× Hydro Sensor
  • 2× Insulated Conductive Wire Bridge
  • 2× Signal Switch
  • 2× Thermo Sensor
  • 1× Liquid Pipe Thermo Sensor

Construction materials

  • 41.6t Ceramic
  • 37.5t Diamond
  • 31.6t Sandstone
  • 20t Basalt
  • 8t Steel
  • 6.7t Cobalt
  • 3.2t Aluminum Ore
  • 1.5t Aluminum
  • 850kg Coquina
  • 800kg Cinnabar Ore
  • 650kg Iron
  • 460kg Plastic
  • 400kg Sedimentary Rock
  • 25kg Lead

Mirrored from BlueprintNotIncluded.