Loading…
Gas cooller notready
An Oxygen Not Included blueprint by Faust. Open it in the browser editor on this page.
cooling
14×12 tiles · 210 buildings
Buildings
- 61× Insulated Tile
- 29× Automation Wire
- 27× Conductive Wire
- 25× Radiant Liquid Pipe
- 24× Gas Pipe
- 14× Insulated Liquid Pipe
- 10× Radiant Gas Pipe
- 4× Gas Pump
- 4× Gas Vent
- 2× Signal Switch
- 2× Thermo Aquatuner
- 1× AND Gate
- 1× Conductive Wire Bridge
- 1× FILTER Gate
- 1× Liquid Pipe Thermo Sensor
- 1× NOT Gate
- 1× OR Gate
- 1× Steam Turbine
- 1× Thermo Sensor
Construction materials
- 25t Sandstone
- 5.6t Sedimentary Rock
- 3.1t Iron
- 3.1t Iron Ore
Mirrored from BlueprintNotIncluded.