Loading…

hot steam vent tamer

An Oxygen Not Included blueprint by noneerror4. Open it in the browser editor on this page.

cooling

44×90 tiles · 1424 buildings

Buildings

  • 391× Insulated Liquid Pipe
  • 301× Insulated Tile
  • 129× Automation Wire
  • 106× Tile
  • 87× Radiant Liquid Pipe
  • 61× Conveyor Rail
  • 43× Tempshift Plate
  • 42× Liquid Bridge
  • 37× Heavi-Watt Conductive Wire
  • 35× Liquid Pipe
  • 27× Metal Tile
  • 22× Conduction Panel
  • 21× Liquid Vent
  • 20× Pneumatic Door
  • 18× Steam Turbine
  • 17× Atmo Sensor
  • 9× Bunker Door
  • 9× Thermo Aquatuner
  • 9× Thermo Sensor
  • 8× Liquid Pipe Thermo Sensor
  • 6× Mechanized Airlock
  • 4× Farm Tile
  • 4× Heavi-Watt Conductive Joint Plate
  • 3× Conveyor Bridge
  • 3× Liquid Valve
  • 3× Power Control Station
  • 2× AND Gate
  • 2× Liquid Reservoir
  • 2× NOT Gate
  • 2× Timer Sensor
  • 1× Automation Wire Bridge

Construction materials

  • 325t Igneous Rock
  • 30t Iron
  • 21.5t Iron Ore
  • 15.3t Steel
  • 9.6t Copper
  • 3.6t Ceramic
  • 2t Sedimentary Rock
  • 400kg Dirt
  • 200kg Sandstone

Mirrored from BlueprintNotIncluded.