Loading…

Steam tamer with duplex water cooling

An Oxygen Not Included blueprint by EarthWaste. Open it in the browser editor on this page.

cooling

19×28 tiles · 378 buildings

Buildings

  • 63× Heavi-Watt Wire
  • 50× Insulated Liquid Pipe
  • 35× Ladder
  • 32× Automation Wire
  • 30× Radiant Liquid Pipe
  • 28× Insulated Tile
  • 28× Tile
  • 28× Wire
  • 24× Conductive Wire
  • 22× Metal Tile
  • 10× Smart Battery
  • 4× Liquid Pipe Thermo Sensor
  • 3× AND Gate
  • 2× Conductive Wire Bridge
  • 2× Large Power Transformer
  • 2× Liquid Bridge
  • 2× Liquid Shutoff
  • 2× Liquid Vent
  • 2× Power Transformer
  • 2× Steam Turbine
  • 2× Thermo Aquatuner
  • 2× Wire Bridge
  • 1× Atmo Sensor
  • 1× Heavi-Watt Joint Plate
  • 1× Thermo Sensor

Construction materials

  • 36.8t Ceramic
  • 8t Iron Ore
  • 8t Iron
  • 3.7t Sandstone
  • 2.4t Steel
  • 665kg Gold
  • 425kg Gold Amalgam
  • 200kg Aluminum

Mirrored from BlueprintNotIncluded.