Loading…
Steam tamer with duplex water cooling
An Oxygen Not Included blueprint by EarthWaste. Open it in the browser editor on this page.
cooling
19×28 tiles · 378 buildings
Buildings
- 63× Heavi-Watt Wire
- 50× Insulated Liquid Pipe
- 35× Ladder
- 32× Automation Wire
- 30× Radiant Liquid Pipe
- 28× Insulated Tile
- 28× Tile
- 28× Wire
- 24× Conductive Wire
- 22× Metal Tile
- 10× Smart Battery
- 4× Liquid Pipe Thermo Sensor
- 3× AND Gate
- 2× Conductive Wire Bridge
- 2× Large Power Transformer
- 2× Liquid Bridge
- 2× Liquid Shutoff
- 2× Liquid Vent
- 2× Power Transformer
- 2× Steam Turbine
- 2× Thermo Aquatuner
- 2× Wire Bridge
- 1× Atmo Sensor
- 1× Heavi-Watt Joint Plate
- 1× Thermo Sensor
Construction materials
- 36.8t Ceramic
- 8t Iron Ore
- 8t Iron
- 3.7t Sandstone
- 2.4t Steel
- 665kg Gold
- 425kg Gold Amalgam
- 200kg Aluminum
Mirrored from BlueprintNotIncluded.