Loading…

GCFungus SourGasBoiler Fixed V1

An Oxygen Not Included blueprint by CriticalJack. Open it in the browser editor on this page.

cooling

20×24 tiles · 589 buildings

Buildings

  • 178× Insulated Tile
  • 73× Insulated Liquid Pipe
  • 68× Heavi-Watt Conductive Wire
  • 58× Automation Wire
  • 53× Insulated Gas Pipe
  • 34× Metal Tile
  • 31× Conductive Wire
  • 22× Tempshift Plate
  • 14× Gas Pump
  • 11× Conveyor Rail
  • 11× Radiant Liquid Pipe
  • 9× Airflow Tile
  • 4× Thermo Aquatuner
  • 4× Thermo Sensor
  • 3× Liquid Vent
  • 2× Conveyor Bridge
  • 2× Heavi-Watt Conductive Joint Plate
  • 2× Liquid Bridge
  • 1× Atmo Sensor
  • 1× Auto-Sweeper
  • 1× Conveyor Loader
  • 1× Gas Vent
  • 1× Liquid Pump
  • 1× Liquid Tepidizer
  • 1× Mechanized Airlock
  • 1× Mesh Tile
  • 1× NOT Gate
  • 1× Steam Turbine

Construction materials

  • 81.2t Granite
  • 29.4t Insulite
  • 28.8t Sandstone
  • 20.2t Thermium
  • 3.3t Steel
  • 700kg Iron Ore

Mirrored from BlueprintNotIncluded.