Loading…

hot steam vent tamer 2- temp

An Oxygen Not Included blueprint by noneerror3. Open it in the browser editor on this page.

cooling

18×12 tiles · 212 buildings

Buildings

  • 56× Insulated Liquid Pipe
  • 32× Insulated Tile
  • 24× Tile
  • 18× Heavi-Watt Conductive Wire
  • 17× Automation Wire
  • 17× Conveyor Rail
  • 8× Liquid Pipe
  • 7× Liquid Bridge
  • 4× Liquid Vent
  • 4× Metal Tile
  • 4× Pneumatic Door
  • 3× Atmo Sensor
  • 3× Heavi-Watt Conductive Joint Plate
  • 3× Tempshift Plate
  • 2× Conduction Panel
  • 2× Liquid Valve
  • 2× Steam Turbine
  • 2× Thermo Sensor
  • 1× Bunker Door
  • 1× Conveyor Bridge
  • 1× Liquid Pipe Thermo Sensor
  • 1× Thermo Aquatuner

Construction materials

  • 43.9t Igneous Rock
  • 4.5t Iron
  • 4.5t Iron Ore
  • 1.7t Steel

Mirrored from BlueprintNotIncluded.