Loading…
hot steam vent tamer 2- temp
An Oxygen Not Included blueprint by noneerror3. Open it in the browser editor on this page.
cooling
18×12 tiles · 212 buildings
Buildings
- 56× Insulated Liquid Pipe
- 32× Insulated Tile
- 24× Tile
- 18× Heavi-Watt Conductive Wire
- 17× Automation Wire
- 17× Conveyor Rail
- 8× Liquid Pipe
- 7× Liquid Bridge
- 4× Liquid Vent
- 4× Metal Tile
- 4× Pneumatic Door
- 3× Atmo Sensor
- 3× Heavi-Watt Conductive Joint Plate
- 3× Tempshift Plate
- 2× Conduction Panel
- 2× Liquid Valve
- 2× Steam Turbine
- 2× Thermo Sensor
- 1× Bunker Door
- 1× Conveyor Bridge
- 1× Liquid Pipe Thermo Sensor
- 1× Thermo Aquatuner
Construction materials
- 43.9t Igneous Rock
- 4.5t Iron
- 4.5t Iron Ore
- 1.7t Steel
Mirrored from BlueprintNotIncluded.