Loading…
waterBoilerVol2
An Oxygen Not Included blueprint by palmal. Open it in the browser editor on this page.
cooling
20×11 tiles · 352 buildings
Buildings
- 79× Insulated Tile
- 67× Insulated Liquid Pipe
- 36× Radiant Liquid Pipe
- 33× Heavi-Watt Conductive Wire
- 30× Automation Wire
- 27× Insulated Gas Pipe
- 26× Conveyor Rail
- 20× Wire
- 6× Liquid Bridge
- 3× Heavi-Watt Conductive Joint Plate
- 3× Liquid Pipe Thermo Sensor
- 2× Gas Pipe Thermo Sensor
- 2× Liquid Shutoff
- 2× Liquid Vent
- 2× Steam Turbine
- 2× Thermo Aquatuner
- 2× Thermo Regulator
- 2× Tile
- 1× AND Gate
- 1× Atmo Sensor
- 1× Auto-Sweeper
- 1× Conveyor Loader
- 1× Gas Bridge
- 1× Liquid Valve
- 1× Power Transformer
- 1× Thermo Sensor
Construction materials
- 36.2t Igneous Rock
- 33.5t Ceramic
- 5.5t Iron
- 3.2t Steel
- 2.3t Iron Ore
- 2t Gold
- 2t Gold Amalgam
- 600kg Sandstone
Mirrored from BlueprintNotIncluded.