Loading…

Hot Liquid Gyser Cooling

An Oxygen Not Included blueprint by ItsGom. Open it in the browser editor on this page.

cooling

10×13 tiles · 139 buildings

Buildings

  • 37× Insulated Liquid Pipe
  • 36× Insulated Tile
  • 16× Radiant Liquid Pipe
  • 11× Conductive Wire
  • 9× Gas Pipe
  • 5× Automation Wire
  • 5× Ladder
  • 4× Heavi-Watt Wire
  • 4× Liquid Bridge
  • 2× High Pressure Gas Vent
  • 2× Signal Switch
  • 1× Gas Pump
  • 1× Heavi-Watt Joint Plate
  • 1× Liquid Pipe Thermo Sensor
  • 1× Liquid Shutoff
  • 1× Liquid Vent
  • 1× Manual Airlock
  • 1× Steam Turbine
  • 1× Thermo Aquatuner

Construction materials

  • 29.6t Igneous Rock
  • 2t Steel
  • 830kg Gold
  • 800kg Aluminum
  • 700kg Sandstone
  • 400kg Iron Ore
  • 400kg Iron
  • 400kg Gold Amalgam

Mirrored from BlueprintNotIncluded.