Loading…

hot steam vent tamer 3

An Oxygen Not Included blueprint by noneerror3. Open it in the browser editor on this page.

cooling

20×10 tiles · 174 buildings

Buildings

  • 47× Insulated Tile
  • 39× Insulated Liquid Pipe
  • 23× Automation Wire
  • 19× Tile
  • 10× Liquid Pipe
  • 6× Tempshift Plate
  • 4× Conduction Panel
  • 4× Mechanized Airlock
  • 4× Metal Tile
  • 4× Radiant Liquid Pipe
  • 3× Liquid Bridge
  • 2× Atmo Sensor
  • 2× Steam Turbine
  • 1× Bunker Door
  • 1× Liquid Pipe Thermo Sensor
  • 1× Liquid Vent
  • 1× Mesh Tile
  • 1× NOT Gate
  • 1× Thermo Aquatuner
  • 1× Thermo Sensor

Construction materials

  • 39.5t Igneous Rock
  • 4.8t Copper Ore
  • 2.8t Iron
  • 2.1t Iron Ore
  • 1.7t Steel

Mirrored from BlueprintNotIncluded.