Loading…
3-gas condenser - Nb for generic ore material
An Oxygen Not Included blueprint by myxal. Open it in the browser editor on this page.
cooling
16×17 tiles · 340 buildings
Buildings
- 64× Insulated Tile
- 59× Insulated Liquid Pipe
- 54× Automation Wire
- 31× Radiant Liquid Pipe
- 21× Conductive Wire
- 18× Gas Pipe
- 16× Heavi-Watt Conductive Wire
- 13× Metal Tile
- 12× Tempshift Plate
- 7× Liquid Bridge
- 6× Hydro Sensor
- 6× Insulated Gas Pipe
- 5× Gas Vent
- 4× Corner Trim
- 4× Thermo Sensor
- 3× AND Gate
- 3× Liquid Pump
- 2× Conveyor Bridge
- 2× Mechanized Airlock
- 2× Thermo Aquatuner
- 1× Automation Wire Bridge
- 1× Ceiling Trim
- 1× FILTER Gate
- 1× Liquid Pipe
- 1× Liquid Pipe Thermo Sensor
- 1× Liquid Vent
- 1× Power Shutoff
- 1× Steam Turbine
Construction materials
- 24.8t Ceramic
- 14.8t Igneous Rock
- 13.2t Mafic Rock
- 10.8t Aluminum
- 8.3t Niobium
- 2.7t Thermium
- 600kg Granite
- 200kg Gold
Mirrored from BlueprintNotIncluded.