Loading…
3-gas condenser
An Oxygen Not Included blueprint by myxal. Open it in the browser editor on this page.
cooling
16×14 tiles · 313 buildings
Buildings
- 65× Insulated Tile
- 63× Automation Wire
- 38× Insulated Liquid Pipe
- 21× Conductive Wire
- 18× Gas Pipe
- 18× Radiant Liquid Pipe
- 16× Heavi-Watt Conductive Wire
- 13× Window Tile
- 12× Tempshift Plate
- 6× Hydro Sensor
- 6× Insulated Gas Pipe
- 5× Gas Vent
- 5× Liquid Bridge
- 4× Thermo Sensor
- 3× AND Gate
- 3× Liquid Pump
- 2× Conveyor Bridge
- 2× Corner Trim
- 2× Mechanized Airlock
- 2× Thermo Aquatuner
- 1× Atmo Sensor
- 1× BUFFER Gate
- 1× Ceiling Trim
- 1× FILTER Gate
- 1× Liquid Pipe
- 1× Liquid Pipe Thermo Sensor
- 1× Liquid Vent
- 1× Power Shutoff
- 1× Steam Turbine
Construction materials
- 16.8t Ceramic
- 14.1t Igneous Rock
- 13.2t Mafic Rock
- 8.8t Aluminum
- 3.6t Niobium
- 3.1t Gold
- 2.7t Thermium
- 2t Iron Ore
- 1.3t Glass
- 500kg Sandstone
- 400kg Granite
Mirrored from BlueprintNotIncluded.