Loading…
steam vent tamer
An Oxygen Not Included blueprint by BesnikNouredini. Open it in the browser editor on this page.
cooling
26×13 tiles · 441 buildings
Buildings
- 117× Insulated Tile
- 86× Insulated Liquid Pipe
- 79× Radiant Liquid Pipe
- 53× Metal Tile
- 45× Tempshift Plate
- 28× Heavi-Watt Conductive Wire
- 10× Bunker Tile
- 8× Liquid Bridge
- 4× Automation Wire
- 4× Steam Turbine
- 3× Heavi-Watt Conductive Joint Plate
- 2× Liquid Vent
- 1× Liquid Pipe Thermo Sensor
- 1× Thermo Aquatuner
Construction materials
- 83.6t Sandstone
- 34.4t Sedimentary Rock
- 15.6t Iron
- 2t Iron Ore
- 1t Steel
Mirrored from BlueprintNotIncluded.