Loading…

Vertical sour gas boiler

An Oxygen Not Included blueprint by ln. Open it in the browser editor on this page.

cooling

9×11 tiles · 184 buildings

Buildings

  • 36× Insulated Tile
  • 25× Radiant Liquid Pipe
  • 23× Conveyor Rail
  • 21× Conductive Wire
  • 17× Insulated Liquid Pipe
  • 10× Automation Wire
  • 7× Gas Pipe
  • 6× Insulated Gas Pipe
  • 6× Tempshift Plate
  • 5× Airflow Tile
  • 4× Conveyor Bridge
  • 4× Radiant Gas Pipe
  • 2× Conductive Wire Bridge
  • 2× Gas Pump
  • 2× Liquid Bridge
  • 2× Metal Tile
  • 2× Thermo Sensor
  • 1× Auto-Sweeper
  • 1× Conveyor Chute
  • 1× Conveyor Loader
  • 1× FILTER Gate
  • 1× Liquid Pipe
  • 1× Liquid Tepidizer
  • 1× Liquid Valve
  • 1× Liquid Vent
  • 1× NOT Gate
  • 1× Thermo Aquatuner

Construction materials

  • 23.4t Ceramic
  • 6.6t Thermium
  • 4.9t Steel
  • 2.4t Lead
  • 500kg Gold
  • 400kg Insulite
  • 200kg Obsidian
  • 100kg Tungsten
  • 25kg Granite

Mirrored from BlueprintNotIncluded.