Loading…
Pompe geothermique
An Oxygen Not Included blueprint by lapinnain2020. Open it in the browser editor on this page.
cooling
39×18 tiles · 601 buildings
Buildings
- 244× Insulated Liquid Pipe
- 161× Insulated Tile
- 66× Conductive Wire
- 41× Radiant Liquid Pipe
- 31× Conveyor Rail
- 12× Liquid Bridge
- 12× Mesh Tile
- 9× Steam Turbine
- 8× Tile
- 6× Automation Wire
- 4× Power Transformer
- 2× Liquid Pipe Thermo Sensor
- 2× Thermo Aquatuner
- 1× Auto-Sweeper
- 1× Conveyor Chute
- 1× Conveyor Loader
Construction materials
- 165t Granite
- 12.9t Steel
- 4.1t Iron Ore
- 2.1t Iron
Mirrored from BlueprintNotIncluded.