Loading…

Planta Energia a Vapor Com Resfriamento

An Oxygen Not Included blueprint by rodrigo. Open it in the browser editor on this page.

cooling

37×18 tiles · 604 buildings

Buildings

  • 176× Insulated Tile
  • 129× Heavi-Watt Wire
  • 79× Conductive Wire
  • 79× Insulated Liquid Pipe
  • 28× Radiant Liquid Pipe
  • 25× Automation Wire
  • 21× Mesh Tile
  • 16× Ladder
  • 9× Insulated Gas Pipe
  • 6× Mechanized Airlock
  • 5× Steam Turbine
  • 4× Heavi-Watt Conductive Joint Plate
  • 4× Liquid Bridge
  • 4× Power Transformer
  • 3× Liquid Pipe Thermo Sensor
  • 3× Thermo Aquatuner
  • 2× Gas Pump
  • 2× High Pressure Gas Vent
  • 2× NOT Gate
  • 2× Pneumatic Door
  • 2× Power Control Station
  • 2× Signal Switch
  • 1× Liquid Vent

Construction materials

  • 106t Igneous Rock
  • 14.4t Steel
  • 13.2t Iron Ore
  • 2.4t Iron
  • 1.6t Obsidian
  • 1.4t Lead

Mirrored from BlueprintNotIncluded.