Loading…

Steam Vent Petrol Boiler V2

An Oxygen Not Included blueprint by PlayerXess. Open it in the browser editor on this page.

cooling

63×32 tiles · 1242 buildings

Buildings

  • 370× Insulated Tile
  • 205× Automation Wire
  • 188× Insulated Liquid Pipe
  • 138× Tempshift Plate
  • 119× Radiant Liquid Pipe
  • 53× Heavi-Watt Conductive Wire
  • 43× Metal Tile
  • 30× Conductive Wire
  • 22× Window Tile
  • 11× Mechanized Airlock
  • 10× AND Gate
  • 10× Thermo Sensor
  • 7× Steam Turbine
  • 6× Liquid Reservoir
  • 5× Liquid Bridge
  • 3× Heavi-Watt Conductive Joint Plate
  • 3× Liquid Vent
  • 3× Smart Battery
  • 2× Conductive Wire Bridge
  • 2× Large Power Transformer
  • 2× Liquid Pipe Thermo Sensor
  • 2× Thermo Aquatuner
  • 1× Automation Wire Bridge
  • 1× Conduction Panel
  • 1× FILTER Gate
  • 1× Liquid Pump
  • 1× Liquid Shutoff
  • 1× Liquid Valve
  • 1× NOT Gate
  • 1× Power Control Station

Construction materials

  • 224t Ceramic
  • 110t Sandstone
  • 15t Cobalt
  • 14.6t Steel
  • 4.3t Aluminum
  • 2.4t Iron Ore
  • 2.2t Glass

Mirrored from BlueprintNotIncluded.