Loading…
Steam Vent Petrol Boiler
An Oxygen Not Included blueprint by PlayerXess. Open it in the browser editor on this page.
cooling
55×22 tiles · 780 buildings
Buildings
- 249× Insulated Tile
- 158× Insulated Liquid Pipe
- 103× Radiant Liquid Pipe
- 76× Automation Wire
- 68× Tempshift Plate
- 45× Heavi-Watt Conductive Wire
- 24× Conductive Wire
- 17× Window Tile
- 6× Liquid Reservoir
- 5× Liquid Bridge
- 5× Steam Turbine
- 4× AND Gate
- 4× Thermo Sensor
- 3× Liquid Vent
- 2× Large Power Transformer
- 2× Liquid Pipe Thermo Sensor
- 2× Smart Battery
- 2× Thermo Aquatuner
- 1× Conductive Wire Bridge
- 1× Heavi-Watt Conductive Joint Plate
- 1× Hydro Sensor
- 1× Liquid Pump
- 1× Liquid Valve
Construction materials
- 155t Sandstone
- 63.2t Sedimentary Rock
- 15.8t Iron
- 5.4t Iron Ore
- 1.7t Glass
- 1.2t Steel
Mirrored from BlueprintNotIncluded.