Loading…

Geotermia

An Oxygen Not Included blueprint by bencor. Open it in the browser editor on this page.

cooling

34×13 tiles · 328 buildings

Buildings

  • 95× Insulated Tile
  • 74× Insulated Liquid Pipe
  • 44× Radiant Liquid Pipe
  • 40× Heavi-Watt Conductive Wire
  • 20× Tempshift Plate
  • 17× Conductive Wire
  • 9× Jumbo Battery
  • 7× Automation Wire
  • 4× Ladder
  • 4× Metal Tile
  • 4× Steam Turbine
  • 1× Heavi-Watt Conductive Joint Plate
  • 1× Large Power Transformer
  • 1× Liquid Bridge
  • 1× Liquid Pipe Thermo Sensor
  • 1× Liquid Vent
  • 1× Mechanized Airlock
  • 1× Pneumatic Door
  • 1× Power Control Station
  • 1× Thermo Aquatuner
  • 1× Thermo Sensor

Construction materials

  • 38t Ceramic
  • 29.7t Igneous Rock
  • 16.4t Sandstone
  • 9.4t Gold
  • 3.7t Iron Ore
  • 2.5t Steel
  • 925kg Iron

Mirrored from BlueprintNotIncluded.