Loading…

HVAC - 6x ATST Cooler

An Oxygen Not Included blueprint by Chiberia. Open it in the browser editor on this page.

cooling

18×17 tiles · 257 buildings

Buildings

  • 66× Insulated Tile
  • 57× Radiant Liquid Pipe
  • 41× Insulated Liquid Pipe
  • 24× Automation Wire
  • 18× Metal Tile
  • 15× Heavi-Watt Conductive Wire
  • 9× Conductive Wire
  • 8× Liquid Bridge
  • 7× Thermo Sensor
  • 6× Mechanized Airlock
  • 1× Large Power Transformer
  • 1× Liquid Pipe Thermo Sensor
  • 1× Liquid Shutoff
  • 1× Liquid Vent
  • 1× Steam Turbine
  • 1× Thermo Aquatuner

Construction materials

  • 43.6t Granite
  • 4.8t Gold
  • 4t Steel
  • 2.9t Iron

Mirrored from BlueprintNotIncluded.