Loading…
HVAC - 6x ATST Cooler
An Oxygen Not Included blueprint by Chiberia. Open it in the browser editor on this page.
cooling
18×17 tiles · 257 buildings
Buildings
- 66× Insulated Tile
- 57× Radiant Liquid Pipe
- 41× Insulated Liquid Pipe
- 24× Automation Wire
- 18× Metal Tile
- 15× Heavi-Watt Conductive Wire
- 9× Conductive Wire
- 8× Liquid Bridge
- 7× Thermo Sensor
- 6× Mechanized Airlock
- 1× Large Power Transformer
- 1× Liquid Pipe Thermo Sensor
- 1× Liquid Shutoff
- 1× Liquid Vent
- 1× Steam Turbine
- 1× Thermo Aquatuner
Construction materials
- 43.6t Granite
- 4.8t Gold
- 4t Steel
- 2.9t Iron
Mirrored from BlueprintNotIncluded.