Loading…
Cool Slush Geyser - Centralized Cooling
An Oxygen Not Included blueprint by seecoryclimb. Open it in the browser editor on this page.
automation
18×13 tiles · 180 buildings
Buildings
- 62× Insulated Tile
- 32× Metal Tile
- 28× Radiant Liquid Pipe
- 18× Automation Wire
- 14× Airflow Tile
- 12× Insulated Liquid Pipe
- 4× Manual Airlock
- 4× Mechanized Airlock
- 4× Thermo Sensor
- 1× Hydro Sensor
- 1× Liquid Pump
Construction materials
- 29.6t Igneous Rock
- 4.8t Aluminum
- 4.2t Aluminum Ore
Mirrored from BlueprintNotIncluded.