Loading…

geyser tamer with cooling

An Oxygen Not Included blueprint by Peoply. Open it in the browser editor on this page.

cooling

19×28 tiles · 396 buildings

Buildings

  • 137× Tile
  • 93× Radiant Liquid Pipe
  • 85× Insulated Liquid Pipe
  • 31× Insulated Tile
  • 29× Automation Wire
  • 4× Liquid Bridge
  • 3× Mechanized Airlock
  • 2× BUFFER Gate
  • 2× Liquid Reservoir
  • 1× AND Gate
  • 1× Atmo Sensor
  • 1× FILTER Gate
  • 1× Liquid Pipe Thermo Sensor
  • 1× Liquid Shutoff
  • 1× Liquid Vent
  • 1× Steam Turbine
  • 1× Thermo Aquatuner
  • 1× Thermo Sensor
  • 1× Timer Sensor

Construction materials

  • 40.2t Sandstone
  • 34t Sedimentary Rock
  • 5.8t Iron
  • 3.6t Iron Ore

Mirrored from BlueprintNotIncluded.