Loading…
Air conditioner
An Oxygen Not Included blueprint by Peoply. Open it in the browser editor on this page.
cooling
23×30 tiles · 518 buildings
Buildings
- 198× Insulated Tile
- 177× Insulated Gas Pipe
- 30× Heavi-Watt Conductive Wire
- 29× Automation Wire
- 28× Radiant Gas Pipe
- 15× Radiant Liquid Pipe
- 8× Metal Tile
- 8× Tempshift Plate
- 7× Gas Bridge
- 4× Thermo Regulator
- 2× Gas Pipe Thermo Sensor
- 2× Gas Pump
- 2× Gas Reservoir
- 2× High Pressure Gas Vent
- 2× Insulated Liquid Pipe
- 1× Heavi-Watt Conductive Joint Plate
- 1× Liquid Vent
- 1× Steam Turbine
- 1× Thermo Sensor
Construction materials
- 157t Sandstone
- 6.1t Iron
- 2.8t Iron Ore
- 800kg Sedimentary Rock
Mirrored from BlueprintNotIncluded.