Loading…

cold 3-1 split turbine

An Oxygen Not Included blueprint by noneerror. Open it in the browser editor on this page.

cooling

20×7 tiles · 85 buildings

Buildings

  • 29× Insulated Liquid Pipe
  • 27× Insulated Tile
  • 11× Radiant Liquid Pipe
  • 9× Automation Wire
  • 2× Liquid Bridge
  • 2× Liquid Vent
  • 2× Tile
  • 1× Atmo Sensor
  • 1× Steam Turbine
  • 1× Thermo Sensor

Construction materials

  • 22.4t Igneous Rock
  • 1.4t Iron
  • 800kg Iron Ore
  • 600kg Sandstone

Mirrored from BlueprintNotIncluded.