Loading…

Shoebox boiler

An Oxygen Not Included blueprint by Kharnath. Open it in the browser editor on this page.

cooling

13×9 tiles · 212 buildings

Buildings

  • 55× Insulated Tile
  • 25× Conductive Wire
  • 24× Insulated Liquid Pipe
  • 19× Conveyor Rail
  • 18× Radiant Liquid Pipe
  • 16× Automation Wire
  • 13× Radiant Gas Pipe
  • 11× Insulated Gas Pipe
  • 8× Window Tile
  • 3× Conveyor Bridge
  • 3× Liquid Pipe
  • 2× Airflow Tile
  • 2× Gas Pump
  • 2× Liquid Bridge
  • 2× Thermo Sensor
  • 1× AND Gate
  • 1× Auto-Sweeper
  • 1× Conveyor Loader
  • 1× Liquid Tepidizer
  • 1× Liquid Valve
  • 1× Liquid Vent
  • 1× Mesh Tile
  • 1× Thermo Aquatuner
  • 1× Timer Sensor

Construction materials

  • 23.6t Igneous Rock
  • 12.5t Ceramic
  • 3.3t Iron Ore
  • 1.9t Steel
  • 1.4t Iron
  • 1.2t Niobium
  • 800kg Glass
  • 300kg Granite
  • 300kg Aluminum
  • 100kg Sandstone

Mirrored from BlueprintNotIncluded.